Design works for the project of Kirovskii apatite mine – Main shaft No.2 – S2×1.5A inspection hoist Apatit JSC
06.06.2013
Design works for the project of Kirovskii apatite mine – Main shaft No.2 – S2×1.5A inspection hoist Apatit JSC
AAT “Apatyt”
Back to the list