IGEA completes works for Usolye factory
The Institute of Mining Electrical Engineering and Automation completed a set of works for the project of chemical preparation line at Eurochem Usolye Potash Plant. General contractor for the project – Passat Scientific and Production Union, LLC.
IGEA scope of responsibility included:
Preparation of a design project containing:
-
Specifications of electrical equipment within the scope of supply (including motors) specifying brands and main performance specifications
-
Single-line power supply diagram, connection diagrams
-
Premises automation diagram
-
Assembly, delivery, adjustment of power boards according to the issued technical documents
-
Connection of local workstations and controller to the power boards
-
Adjustment of the drive protection and controls to the optimum performance
-
Development and installation of the following software:
Hardware configuration for controllers, controls and instruments, switchgear, protection and start-control devices, operator’s boards.
Functions and sets of variables (DB STEP7 data blocks) required to read and/or record data of all devices in Profibus-DP and Profibus-PA networks.
Simocode Pro V electric motor protection and controls software
Sinamics G120 frequency converter software
Status code descriptions for the devices connected in Profibus-PA network
Application of the IGEA’s equipment to the drive provided:
-
Lower power consumption
-
Longer equipment service life due to efficient power electrical equipment control techniques, application of high-speed digital control devices, wide instrumentation network
-
Improved safety with fewer alarms and emergency modes and selective protection of the electrical equipment, as well as precise protection setting according to the required workload